Topsoil Calculator
Enter your bed size and depth to get cubic yards, tons and bags
Why a range and not one number: topsoil (screened) is quoted at about 2,200 lb per cubic yard, but the real figure runs from 2,000 to 2,600 lb. Screened and relatively dry at the low end; wet or with heavy clay content at the high end. Order against the cubic yards — suppliers convert to tons using their own material’s density, and that is the number that should win.
The calculation
cubic yards = (length x width x depth in inches / 12) / 27
The two conversions in that line are where the mistakes happen. Depth is quoted in inches while the area is in feet, so it must be divided by 12 first; and a cubic yard is 27 cubic feet, not 3, because it is 3 ft in each of three directions.
How deep should it go?
| Use | Typical depth |
|---|---|
| New lawn from seed or sod | 4–6 in of screened topsoil over the subsoil |
| Topdressing an existing lawn | ¼–½ in, applied thinly so grass is not smothered |
| Vegetable beds | 8–12 in for root crops |
| Filling a raised bed | full depth of the bed, usually 10–12 in |
Related Calculators
Frequently Asked Questions
How do I work out how much topsoil I need?
Multiply the area by the depth, then convert to cubic yards. A bed 20 ft by 10 ft at 3 in deep is 200 sq ft x 0.25 ft = 50 cubic feet, and 50 / 27 = 1.85 cubic yards. Depth is the input people get wrong, because it is given in inches while everything else is in feet.
How many tons is a cubic yard of topsoil?
About 1.10 US tons, using a typical density of 2,200 lb per cubic yard. The honest range is 1.00 to 1.30 tons. Screened and relatively dry at the low end; wet or with heavy clay content at the high end.
Should I order by cubic yards or by tons?
By cubic yards wherever you can. Volume is fixed by your measurements, while tonnage depends on the density of the specific material on the day — including how wet it is. If a supplier quotes tons, let them do the conversion from your yardage using their own density.
Should I add extra for settling?
Usually yes. Loose material compacts once it is spread and walked on, and every job loses a little to spillage and uneven subgrade. Ordering 5 to 10 percent over the calculated volume is normal; running short mid-job costs a second delivery charge.